How we got here

The working behind the Croydon sample.

This is the engine's own working page for the sample comparison: a 1920s bungalow in Croydon, Sydney (street number not shown), run through engine v0.4.4 on 28 October 2026. It shows the inputs, quantities and main assumptions behind each number. Rate tables stay in the engine; every figure carries a source ID from the methods page.

What we were told

House type
Interwar Californian bungalow (1915-1940)
Floor area and storeys
110 m², 1 storey
Condition and renovation history
Good condition, original
Shape, ceiling height, windows
Rectangular, 3.0 m ceilings, average window
Insulation: ceiling / walls / underfloor
No / No / No
Glazing, draughts, damp
Single glazing, lots of draughts, damp: no
Heating now, solar
Gas, solar: no
Orientation, structure, kitchens
North; structure: none seen; kitchen and bathrooms: dated but working
Planning
Site 483 m² · R2 · FSR 0.55:1 · height limit 8.5 m · heritage: heritage conservation area, flood: no, bushfire: no
Client goals and time in the home
must have: more space, better comfort and lower bills; staying about 20 years; budget around $1.2m
Scope settings
Custom builder, mid finish; extension 80 m² ground floor; new house 190 m²; heating upgrade in Retrofit: no

What we worked out about the house

Footprint
110 m²
Perimeter
44 m (shape factor 1.06 x a square)
External wall area, less windows
111 m²
Window area
22 m² (20% of floor area)
Windows double glazed in Retrofit
17 m²
Weight of the existing house
88–132 t
Asbestos risk for this house type
Medium
Comfort score today (1-5)
1.2
Household electricity benchmark
9,008 kWh a year for 5 people (AER, S18)

What each option includes

RetainRetrofitExtendReplace
ScopeInterior and exterior paint, new floor coverings, repairs (good condition)Paint, floor coverings and repairs as Retain, plus ceiling insulation, wall insulation, underfloor insulation, draught sealing and double glazing the worst windows, asbestos allowanceAdd 80 m² (ground floor, mid finish), tie-in, plus a deeper retrofit of the existing houseDemolish and remove asbestos, build about 190 m² (mid finish), site works and services

Cost (AUD incl. GST)

RetainRetrofitExtendReplace
Works$12k–$28k$35k–$84k$329k–$489k$662k–$1.08m
Renovation history allowance––––
Contingency (15%)$2k–$4k$5k–$13k$49k–$73k$99k–$161k
Total$13k–$32k$40k–$97k$378k–$562k$761k–$1.24m
Shown on the report (rounded)$15k–$30k$40k–$95k$380k–$560k$760k–$1.25m

Carbon (t CO₂e)

RetainRetrofitExtendReplace
Embodied (upfront building work)1–4 t7–17 t25–65 t40–100 t
Running (grid electricity and gas over the years staying)30–60 t25–45 t25–45 t25–40 t
Total30–60 t30–60 t50–110 t65–140 t
Band on the report (vs Replace)LowLowMediumHigh

Materials and waste

RetainRetrofitExtendReplace
Removed from the existing houseup to 2 t1–3 t3–13 t90–135 t
Share of the house kept100%100%90%–95%0%
Construction waste from new workunder 1 tunder 1 t2–6 t6–15 t
To landfillup to 1 tup to 2 t1–8 t15–50 t

Running energy and bills

RetainRetrofitExtendReplace
Comfort score after works (1-5)1.23.53.54.0
Electricity used (kWh a year)6,521–7,6176,355–7,3006,381–7,3516,486–7,549
Gas for heating (MJ a year)6,789–12,6831,546–2,8882,381–4,448–
Energy bills ($ a year)$2,578–$4,006$2,348–$3,311$2,385–$3,421$2,331–$3,222
Bills over the years staying$52k–$80k$47k–$66k$48k–$68k$47k–$64k
Change vs today–About 10–15% lower than todayAbout 10–15% lower than todayAbout 10–20% lower than today

Suggested option check

RetainRetrofitExtendReplace
Meets 'more space'NoNoYesYes
Meets 'better comfort'NoYesYesYes
Meets 'lower bills'NoYesYesYes
Meets every must-haveNoNoYesYes
Within budgetYesYesYesYes
Cost, carbon, waste and time (0-100, lower is better)81044100
Time used (months, incl. council wait)121020
How we chose
Must-have goals first, then nice-to-haves, then budget (top figure $1.2m, well over = mid cost more than 15% above it), then the lowest overall cost, carbon, waste and time, each as a share of the highest option.
Result
Extend, with a deeper retrofit. Adding an 80 m² extension and a deeper retrofit of the existing house is estimated to meet all three goals: more space, better comfort and lower bills, for roughly $380k–$560k. Especially since you need more space and the existing house is uncomfortable today, extending with a deeper retrofit looks like a good fit for this brief. That's less than half the cost and about 65% of the carbon of replacing. A light retrofit alongside the extension would fall short of the goals, so this includes a deeper retrofit of the existing house: insulation, better windows and draught sealing. It keeps most of the existing home, with one round of building work, not two.
Why a deeper retrofit
With only a light retrofit (ceiling insulation and draught sealing), Extend would cost about $350k–$500k and cut bills by about 9%, short of the 10% the bills goal needs. The deeper retrofit adds about $25k–$60k and cuts bills by about 12%, so it meets every goal and still fits the budget.

Site potential

Site check
Zoned R2 Low density residential. Depending on planning regulations and council controls, at an FSR of 0.55:1 this 483 m² site could allow about 266 m² of floor area, 2.4 times the current house. At 483 m² in R2 with an 8.5 m height limit, the site might suit a dual occupancy if it meets the council's minimum lot size (450 m² assumed here). In a heritage conservation area, more homes on the site and demolition are much harder to get approved, so the zoning alone doesn't show what's possible.
Numbers used
Floor area allowed 266 m²; minimum lot size 450 m² (assumed for R2)

Main assumptions

Contingency 15% on every option. No renovation allowance (original house). Costs from RLB Riders Digest 2026 (S01) and Sydney trade guides (S02-S08).

Electricity 28–34c per kWh plus $1.41–1.85 a day (2026-27 default market offer, S19), at today's prices for every year.

NSW grid carbon averages 180–270 g CO₂e per kWh over the next 20 years as coal closes (S21, S22). Today it is 640 g.

Heating and cooling come from NatHERS star bands for the comfort score (S17); 35–50% of that load is assumed actually used, as households heat and cool only part of the house (internally assessed, calibrated to S18).

New-build carbon 0.20–0.50 t CO₂e per m² (EPiC, S25, with the low end widened to cover measured built houses, S10; cross-checked against GBCA 2025, S09); additions 0.20–0.55 t per m².

Demolition waste 70–85% recycled (National Waste Report, S23). Asbestos always goes to landfill.

Comfort score: house-type baseline, adjusted for insulation, glazing, draughts, damp, condition and orientation, plus points for each retrofit upgrade (internally assessed, low accuracy). 4 = the BASIX minimum (7 stars), so a new home shows 4, or 5 if built above minimum; a retrofit tops out at about 3.5.

Values marked IA are internally assessed (low accuracy) and are being checked through the pilot.

Sources

All 25 sources, with links and reliability ratings, are listed on the methods page.

How the numbers are worked out → Back to the sample →

Illustrative example based on a real house, not an assessment of it. Indicative, order-of-magnitude estimates for early feasibility discussion. Not a quote, and not a structural, planning or valuation assessment. Full disclaimer.

retain.solutionsretainsolutions

Clearer conversations about homes worth keeping.

We acknowledge the Gadigal people of the Eora Nation, the Traditional Owners of the land and waters where these projects take place.

hello@retain.solutions

Put a project through · Share feedback · Roadmap · Methods · Disclaimer · Privacy ·

© 2026 retain.solutions